The ultimate goal of the Malahat Community Internet project is to have the entire Nation, houses and offices, connected together in a mesh layout. This enables Malahat to retain ownership of our networking infrastructure while providing free, fast internet access to our members. Other benefits include security oversight, IoT opportunities, and significant cost savings over the long run. Every building that is connected to our network saves up to $300/month in Shaw bills.

This project will roll out in phases and is subject to change. Phases can be implemented simultaneously and the order is not important.

 

Phase 1 - Inter-building connectivity in upper cluster

DJI_0004_ZVWnqAM2 Zoom in copy.png

We currently have all 5 upper cluster addresses connected via conduit as shown above. The external connection comes from Shaw and runs into 3 Kwunew Kwasun Lane. From there, the connectivity is distributed to 5 & 7 Kwunew Kwasun Lane, and 1121 Jesken Road. 1 Kwunew Kwasun still needs to be connected to the network, but the conduit is installed and ready to go. See below for a more zoomed out version of the above photo.

DJI_0004_ZVWnqAM2  V2 copy.png

These connections are currently based on copper cabling (CAT6) and can support speeds approaching 1Gbps up to 300ft. The connection between 3 KKL and 7KKL is longer than 300ft and is subject to a small amount of bandwidth degradation. To complete Phase 1, we will need to replace these copper cables with fibre optic cables which have far higher range and bandwidth limitations.

Funding Received: CIRA - $16,081

Timeline: August 1, 2022 - September 30, 2022

Line Items:

GL Description Amount
51810 SFP Transceiver for Netgate 1537 Firewall x 2 $300
  SFP Transceiver for Netgear ProSafe GS752TPS Switch x 4 $1100
  Panduit FWME2 Fibre Enclosure x 4 $560
  Panduit FAP12WBULCZ Fibre Adapter Panel x 4 $1332
  Panduit FRME1U Rack Mounted Enclosure $1980
  Panduit Simplex LC Connector x 24 $696
  12" x 12" x 6" Junction Box $120
  1000' 12 Strand Fibre Optic Cable SM $784
  NETGEAR ProSafe GS752TPS Switch $1380
  NETGEAR M4100-12GF Switch $1239
  Fibre Optic Patch Cables x 20 $110
57300 Materials and Supplies $480
55910 Contractor Wages $6000
  Total $16081

 

Phase 2 - Broad wireless network

The most cost effective way to connect existing houses (and satellite offices) to our network is using a "wireless fibre" system  such as https://www.radwin.com/ptmp-jet-series/

beamforming-gif-img.jpg

These carrier class point-to-multipoint networks consist of a base station which broadcasts a special kind of wireless signal. This is not like regular WiFi; it is designed to go much farther, similar to 5G. The downside of these systems is they require special "subscriber units" to receive the signal. These units are installed in the home like a modem, they receive the wireless signal and convert it to regular WiFi that regular devices can make use of. One central base station installed on the roof of 3 or 7 KKL should have more than enough range to service the entire community in it's current layout. Both 3 and 7 KKL have existing conduit running to the roofs for the solar installations, making it simple to wire up a base station.

Annotation 2022-03-23 154500.png

Radwin Details
Base Stations
Neo Series - Single Carrier - 700Mbps - 64 Homes - 90 Degrees - $1100USD
Neo Duo - Dual Carrier - 700Mbps x 2 - 128 Homes - 90 Degress - $2000USD
Subscriber Unit
SU-Air-500 - 500Mbps $179USD

Range 3-5 Miles Line-of-Sight

Wireless Design.pdf

Promo Video

Funding Received: CIRA - $46,434.94

Line Items:

GL Description Amount
51810 Radwin MultiSector Base Station RW-5PG5-9154 x 2 $4402.56
  Radwin Subscriber Unit Radio RW-5HC5-1A54 x 30 $5550.00
  Radwin 2000 Alpha Antenna RW-2154-6HC5 x 4 $2024.00
  RT-AX1800S AX1800 Dual-Band Wi-Fi 6 Wireless Router x 30 $3899.70
  PoE Injector x 2 $169.34
  Cat 6 Ethernet Cable 1000' x 3 $957.00
  RJ-45 Connectors 100 Pack x 2 $60.00
  Lightning Protection Units 10 Pack x 4 $4233.60
  Lightning Protection Units x 2 $258.00
57300 Materials and Supplies $882.00
55910 Contractor $24000
  Total $46434.94
 

Phase 3 - Wiring new builds

Malahat should make it standard practice to plan for wired connectivity to our network on all new builds, residential or commercial.

Estimated cost to wire new buildings: $2000-$10,000 per building, depending on distance from existing cabling

 

Phase 4 - Extend fibre connectivity from business park

Screenshot 2022-08-03 082148.png

Business Park Utility Building-comp.jpg

Malahat has negotiated with Shaw to bring in a 10Gbps fibre connection to the business park. Once this has been installed, Malahat should look into further expanding this connection into the community. Options could be:

  • running cable along existing power poles
  • installing new poles
  • running conduit

Estimated cost to extend fibre connection: $100,000-$200,000

Potential Funding:

https://www.pathwaystotechnology.ca/home

https://www.sac-isc.gc.ca/eng/1100100010656/1533645154710

https://cib-bic.ca/en/sectors/indigenous-infra/

https://www.ic.gc.ca/eic/site/139.nsf/eng/h_00006.html

https://www.ic.gc.ca/eic/site/119.nsf/eng/home

https://crtc.gc.ca/eng/internet/fnds.htm

https://www.telus.com/en/pollinatorfund